Generation at Maximum Demand total of Previous Day 559 MW | Written Exam Result (Assistant Secretary) has been published
Upcoming Projects
Name Of The Project: Ashugonj 200±10% MW Modular Power Plant Project
Project Highlights: The Generation capacity of Ashugonj will be 1500MW by 2015.The plant efficiency will increase with the use of modern technology.
Objective: a. To narrow the ever increasing gap between the demand and supply of electricity through gas based low cost generation in the north east zone of the country.
b. To meet up increasing power demand in the country by adding local generation.
c. To increase the power generation of the country through utilization of country's natural gas resources available nearest to the proposed power plant site with requisite pressure.
d. To accelerate the economic development of the country by adequate and reliable power generation and to support the planed target of power demand.
e. To overcome the present generation shortage by increasing generation and to minimize load shedding.
f. To enhance the stability and reliability of the national grid system and reduce the transmission loss by local generation.
g. To increase energy efficiency of power generation.
Present Status: Tender Evaluation on going.
Downloads
APSCL Power Generation Master Plan
APSCL Power Generation Master Plan 2012
Ashuganj 450MW CCPP (North) Project
Result of Ashuganj 450 MW CCPP (North) Project
Soil Investigation Report of North Project Site.
Draft Grid Code of Bangladesh
Coal Fired Thermal Power Plant
Amendment-1 of Notice
Amendment-2 of Notice
Amended Detailed Terms of Reference as well as EOI Document for Feasibility Study, IEE, EIA & SIA of 2x660MW Coal Fired Thermal Power Plant.
Notice
Training Program
Training Schedule 2013-14
Job
Job Application Form
Notice

13-Apr-2014
Written Exam Result (Assistant Secretary) has been published

Event & Gallery