DESCRIPTION UNIT-1 UNIT-2 UNIT-3 UNIT-4 UNIT-5 GT-2 50 MW GE Total
Installed
Capacity (MW)
64 64 150 150 150 56 53 687
Present
(De-rated)
Capacity (MW)
64 64 150 150 150 40 53 671
Generation at Maximum Demand on (Date Wise)
18 September, 2014 0 50 130 140 130 0 41 491
17 September, 2014 0 50 130 140 130 0 41 491
16 September, 2014 0 50 130 140 130 0 41 491
15 September, 2014 0 50 130 140 130 0 41 491
14 September, 2014 0 50 0 140 130 0 43 363
13 September, 2014 0 50 0 140 130 0 38 358
12 September, 2014 0 50 0 140 130 0 41 361
11 September, 2014 0 50 130 140 130 0 43 493
10 September, 2014 0 50 130 140 130 0 42 492
09 September, 2014 0 50 130 140 130 0 42 492
08 September, 2014 0 50 130 140 130 0 42 492
07 September, 2014 0 50 130 140 130 0 42 492
06 September, 2014 0 50 130 140 130 0 42 492
05 September, 2014 0 50 130 140 130 0 42 492
04 September, 2014 0 50 130 140 130 0 39 489
03 September, 2014 0 50 130 140 130 0 39 489
02 September, 2014 0 50 130 140 130 0 36 486
01 September, 2014 0 50 130 140 130 0 39 489
Downloads
APSCL Power Generation Master Plan
APSCL Power Generation Master Plan 2012
Training Program
Training Schedule 2014-15
Job
Notice

16-Sep-2014
Viva Exam Notice for the Post of Sub-Asst. Engineer (Mechanical & Electrical)

Event & Gallery