Generation at Maximum Demand total of Previous Day 564 MW | Written Exam Routine
Career
Available Vacancies
(Please click at the respective Job Title to download the Job Description and further Instructions.)
Job Title Publish date
Career in Power Sector [Post: Director (Planning & Project)] 22 Apr, 2013 
Employment Opportunity [Posts: Manager (Chemical), Assistant Manager (HRM), Procurement, Security & Discipline)] 24 Apr, 2013 
Available Results:
(Please click at the respective title to download the result.)
Title
Written exam result of Manager (Procurement) & Deputy Manager (Internal Audit & Control)
Valid List of Assistant Manager (MIS & ICT)
Valid List of Manager (Health,Safety & Environment)
Manager (Health, Safety & Environment) & Asstt. Manager (MIS & ICT) Written Exam Routine
Downloads
APSCL Power Generation Master Plan
APSCL Power Generation Master Plan 2012
Ashuganj 450MW CCPP (North) Project
Resettlement Plan of Ashuganj 450 MW CCPP (North) Project
Invitation for Bids of Ashuganj 450MW CCPP (North) Project
Bid Document Vol. 1 of 3
Bid Document Vol. 3 of 3
Bid Document Vol. 2 of 3
Meeting minutes of Pre-Bid Meeting.
Site Layout of Ashuganj 450MW (North) and (South) Projects
Amendment-1 of 450 MW CCPP (North)
230kV GIS- North Scope
Bathymetric survey report of Meghna River.
Soil Investigation Report of North Project Site.
North layout and plot plan.
APSCL site.
APSCL topographic map.
Amendment-2 of 450MW CCPP (North)
Draft Grid Code of Bangladesh
Training Program
Training Schedule- 2012-2013
Job
Application Form for the Post of Director (Planning & Project)
Application Form [Post: Manager (Chemical), Asstt. Manager (HRM/Procurement/Security)]
Recent Event

06-May-2013
Written Exam Routine