Generation at Maximum Demand total of Previous Day 456 MW | Notice of Viva Exam for the post of Manager (Procurement) and DM (Audit). Generation at Maximum Demand total of Previous Day 456 MW | Written Exam Routine
Board of Directors
Mr. Md. Anwar Hossain
Chairman
Joint Secretary (Development)
Power Division, MOPEMR
Email: anwar7412@gmail.com
Phone: 02 9540248
Dr. Md. Quamrul Ahsan
Director
Professor, Dept. of Electrical & Electronic Engineering, Bangladesh University of Engineering & Technology, Dhaka
Email: qahsan@eee.buet.ac.bd
Phone: 02 9665650-80, Ext: 6448
Mr. Tamal Chakraborty
Director
Member (Generation), BPDB
Email: member.generation@bpdb.gov.bd
Phone: 02 9664104
Mr. Mamtaz Uddin Ahmed
Director
President, Institute of Cost & Management Accountants of Bangladesh
Email: mamtaz_uddinahmad58@yahoo.com
Phone: 02 9661920
Mr. Md. Abduhu Ruhullah
Director
Member (P&D), BPDB
Email: member.pnd@bpdb.gov.bd
Phone: 02 8143262
Mr. Md. Abu Taher
Director
Member (Distribution), BPDB
Email: member.distribution@bpdb.gov.bd
Phone: 02 9564673
Mr. Md. Shamsul Haque
Director
Director, FBCCI, Dhaka
Nominated by Power Division
Email:shamsulpvt@yahoo.com
Phone: 0741-62674
Mr. Mustakim Billah Faruqui
Director
Director, Prime Minister Office, Dhaka
Email: mustakim.faruqui@yahoo.com
Phone: 02 8151315
Mr. Sheikh Faezul Amin
Director
Deputy Project Director &
Deputy Secretary, Power Division
Email: faez_1965@hotmail.com
Phone:02 9513509
Mr. Kazi Nazir Hossain
Director
Deputy Secretary (Operation)
Energy & Mineral Resources Division
Email: nazirhossain.2010@yahoo.com
Phone: 7160360
Mr. Md. Nurul Alam P.Engg.
Director
Managing Director, APSCL
Email: md@apscl.com
Phone: 08528-74004
Downloads
APSCL Power Generation Master Plan
APSCL Power Generation Master Plan 2012
Ashuganj 450MW CCPP (North) Project
Resettlement Plan of Ashuganj 450 MW CCPP (North) Project
Invitation for Bids of Ashuganj 450MW CCPP (North) Project
Bid Document Vol. 1 of 3
Bid Document Vol. 3 of 3
Bid Document Vol. 2 of 3
Meeting minutes of Pre-Bid Meeting.
Site Layout of Ashuganj 450MW (North) and (South) Projects
Amendment-1 of 450 MW CCPP (North)
230kV GIS- North Scope
Bathymetric survey report of Meghna River.
Soil Investigation Report of North Project Site.
North layout and plot plan.
APSCL site.
APSCL topographic map.
Amendment-2 of 450MW CCPP (North)
Draft Grid Code of Bangladesh
Training Program
Training Schedule- 2012-2013
Job
Recent Event

19-May-2013
Notice of Viva Exam for the post of Manager (Procurement) and DM (Audit).

06-May-2013
Written Exam Routine